PROJECT: East Slash Compressor Station
LOCATION: Permian Basin
OPERATOR: Crestwood Midstream Partners LP
F&C Engineers provided engineering for a compressor station operated by Crestwood Midstream Partners LP. The compressor station has up to 100MMSCFD capacity from the Permian Basin. The design allows for 100% modularization of the stations to include skidding all equipment and pipe racks, field work was minimized allowing for faster, safer installation and execution.
Equipment Includes:
- Inlet Slug Catcher
- 6+4 Compressors
- Coalescing Filter Skid
- 2 TEG Dehydration
- Fuel Gas
- LACT
- Gun-barrel
- Tank Battery
- Truck Load
- Air Compressor
- E-house